For factories, RMG & textile

Procurement support for factory solar and storage projects

Factory projects need more than a generic panel list. Share roof, load, operating schedule and backup requirements so the equipment conversation starts with the right technical inputs.

Built around your brief

  • Rooftop PV equipment for manufacturing and textile facilities
  • Three-phase inverter and battery-storage specification reviews
  • Procurement planning around operating schedules and backup loads
  • Document packs for internal engineering or EPC review

Supply workflow

  1. 1Describe the facility type, approximate load and project stage
  2. 2Share preferred capacity, equipment brands or technical constraints
  3. 3Review model availability, documentation and delivery assumptions
  4. 4Receive a quotation that separates equipment, transport and installation scope

What to verify

  • Use the RFQ to document roof, load and delivery assumptions
  • Request current datasheets and model-specific warranty terms
  • Keep savings and payback calculations tied to measured project inputs

Frequently asked questions

What information should a factory include in an enquiry?+

Include facility type, available roof or land area, approximate load, operating hours, desired backup duration, preferred capacity and delivery location. A BOQ or single-line diagram is helpful when available.

Can Noor Solar provide a project-specific price online?+

Solar equipment pricing changes by model, quantity, documentation, delivery and commercial terms. Request a current quotation instead of relying on an undated price claim.

Next step

Send your project specification

Include products, quantity, delivery location and timeline for a more useful quotation.

Send RFQ